Saturday 17 September 2011

Are We There Yet?

Nearly!  Most of the walls have been primed, the balcony has been rendered, the spot lights have been installed and the regulation fire wall is up between the lounge and the hallway:

Entrance to loft

Required fire wall (staircase to loft)

Rendered balcony wall


The spot lights have been attached in the loft

To the left is the loft bathroom, to the right is the loft entrance

No comments:

Post a Comment